Description
Business activity: Heat energy production, distribution and supply.
Facilities: Total capacity of installed boilers – 1,606 Gcal/h. The length of the long-distance heating networks is ~ 105.338 km in two-pipe calculation. The length of the district heating networks in the heating system is ~ 187.538 km in a two-pipe calculation.
Average number of employees: 1071
Land plot:
owned: 0 ha
in use: 43.2 ha
rented: 0 ha
Legal obligations: no data
Additional information: The company owns and operates 6 district gas boilers, equipped with 31 steam and hot water boilers of ten types; 382.208 km of long- and short-distance heating networks with a diameter of 57-1,020 mm.
Share proposed for privatization: 100%
Starting price: ТВС
Investment advisor: not selected
You must be logged in to post a question.